Resolution No. 408 1(69)
Introduced by: Committee of the Whole
A RESOLUTION ADOPTING A CONNECTING
HIGHWAY CHANGE AGREEMENT BETWEEN THE STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION AND THE CITY OF BURLINGTON
FOR TWO-WAY TRAFFIC RECONFIGURATION
WHEREAS, the City of Burlington has worked with
the Wisconsin Department of Transportation (DOT) to
modify the present connecting highway system within the
City’s downtown area from a one-way paired configuration
to a two-way traffic roadway system; and,
WHEREAS, said improvements are now in place and
traffic is utilizing this new approved connecting
highway system; and,
WHEREAS, the State of Wisconsin provides
connecting highway mileage aids pursuant to designated
routes; and,
WHEREAS, the parties
hereto do mutually agree to the change in connecting
highway status described within the Connecting
Highway Change Agreement Amendment to Connecting Highway
change Agreement #154 (1998) Between the Wisconsin
Department of Transportation and the City of Burlington,
attached hereto as Attachment A; and
WHEREAS, this agreement will have
no effect on current connecting highway mileage aids.
NOW, THEREFORE, BE IT RESOLVED by the Common
Council of the City of Burlington that the Connecting
Highway Change Agreement Amendment to Connecting Highway
change Agreement #154 (1998) Between the Wisconsin
Department of Transportation and the City of Burlington,
attached hereto as Attachment A is hereby approved.
BE IT FURTHER RESOLVED that the Mayor is hereby
authorized and directed to execute said Agreement
Amendment.
BE IT FURTHER RESOLVED that the City Clerk shall
forward executed copies of said Agreement Amendment to
the City Engineer, care of Tom Foht and to Frank Furdek,
Wisconsin Department of Transportation, 141 NW Barstow
Street, P.O. Box 798, Waukesha, WI 53187-0798.
|
Introduced:
August 2, 2005
Adopted: March 6, 2007
|

_______________________________
Claude Lois, Mayor

Attest:__________________________
Beverly R. Gill, City Clerk
Attachment A
CONNECTING HIGHWAY CHANGE AGREEMENT
AMENDMENT TO CONNECTING HIGHWAY CHANGE
AGREEMENT #154 (1998)
BETWEEN
THE WISCONSIN DEPARTMENT OF
TRANSPORTATION
AND
THE CITY OF BURLINGTON
This agreement, made and entered into
by and between the Wisconsin Department of
Transportation, hereinafter called the State, and the
City of Burlington, hereinafter called the City,
Whereas, Section 86.32(1),
Wisconsin Statutes enables the State to designate
certain marked routes of the state highway system over
the streets or highways in any municipality for which
the municipality will be responsible for maintenance and
traffic control, and
Whereas, the character of
travel service provided by this route, uniformity of
maintenance, the effect on the maintaining agency and
the municipality’s maintenance capability are
considerations predicating this designation, and
Whereas, reimbursement for
maintenance of the connecting highway shall be
determined using the rates per lane mile provided for
under Section 86.32, Wisconsin Statutes, and
Whereas, Pine Street, Dodge
Street and Chestnut Street located in Section 32,
Township 3 North, Range 19 East, City of Burlington,
Racine County are now two-way traveled streets, and
Whereas, this agreement is to
serve as an amendment to Connecting Highway Change
Agreement #154 (1998), attached, and
Whereas, this agreement will
have no effect on current connecting highway mileage
aids, and
Whereas, the parties hereto
do mutually agree to the change in connecting highway
status described below under the conditions as specified
below,
ROUTE DESCRIPTION:
Delete existing STH 11 from the
Connecting Highway System along the following streets:
-
Chestnut Street from
Chestnut Street and Pine/Herman Street(s) to
Chestnut Street and Dodge Street, located in Section
32, Township 3 North, Range 19 East, City of
Burlington, Racine County.
-
Dodge Street from
Dodge Street and Chestnut Street to Dodge Street and
Adams Street located in Section 32, Township 3
North, Range 19 East, City of Burlington, Racine
County.
-
Jefferson Street from Jefferson Street and Pine
Street to Jefferson and Main Street located in
Section 32, Township 3 North, Range 19 East, City of
Burlington, Racine County.
-
Main
Street from Main Street and Jefferson Street to Main
Street and State Street located in Section 32,
Township 3 North, Range 19 East, City of Burlington,
Racine County
-
Kendall Street from Kendall Street and Chestnut
Street to Kendall Street and Pine Street located in
Section 32, Township 3 North, Range 19 East, City of
Burlington, Racine County
Add STH 11 to the Connecting Highway
System along the following streets:
-
Pine Street from the
intersection of Pine Street and Kendall Street to
the intersection of Pine/Herman Streets and Chestnut
Street, located in Section 32, Township 3 North,
Range 19 East, City of Burlington, Racine County.
-
Pine Street from the
intersection of Pine Street and Jefferson Street to
the intersection of Pine Street and Adams Street,
located in Section 32, Township 3 North, Range 19
East, City of Burlington, Racine County.
-
Adams Street from the
intersection of Adams Street and Pine Street to the
intersection of Adams Street and Dodge Street,
located in Section 32, Township 3 North, Range 19
East, City of Burlington, Racine County.
CONDITIONS OF DESIGNATION:
The effective date of this Connecting
Highway Change shall be date of the execution of this
agreement by the state.
APPROVAL
This Agreement is approved and
enacted by:
__________________________
Authorized Signature
Date
City of Burlington
__________________________
Authorized Signature
Date
Wisconsin Department of Transportation
|